A pencil system with hydraulic actuation and remote operation, eliminating person-equipment interaction. It included an on-site survey stage, engineering proposal iteration, structural analysis and DEM analysis, fabrication, factory operational testing (test bench simulating real operating conditions). Validation at the operating plant, advisory for assembly and operational testing at the site. Comprehensive project accompaniment and advisory.





